This is the extract from the decision notice -
3 Prior to the commencement of development including demolition a Construction Logistics Plan (CLP) shall be submitted to and approved in writing by the Local Planning Authority. The CLP shall include the following information for all construction phases of the development:
a) Hours of construction;
b) Hours of deliveries;
c) Parking of vehicles associated with deliveries, site personnel, operatives and visitors;
d) Facilities for the loading and unloading of plant and materials;
e) Details of the storage facilities for any plant and materials;
f) The siting of any site huts and other temporary structures, including site hoardings;
g) Details of the proposed security arrangements for the site;
h) Details of the precautions to guard against the deposit of mud and substances on the public highway, to include washing facilities by which vehicles will have their wheels, chassis and bodywork effectively cleaned and washed free of mud and similar substances prior to entering the highway;
i) Details outlining the proposed range of dust control methods and noise mitigation measures;
j) Details demonstrating compliance with the non-road mobile machinery (NRMM) regulations 2015; k) Details confirming that all delivery vehicles are registered under the Freight Operators Recognition Scheme (FORS) achieving a minimum of silver status. All construction phases of the development shall be carried out strictly in accordance with the details so approved.
Reason: To safeguard the amenity of surrounding residents and the area generally, and to prevent adverse impacts upon the transport network during the construction phase of the development. This condition is required to be pre-commencement to ensure that all phases of construction do not adversely impact the amenity of surrounding residents and the area generally, and do not adversely impact upon the transport network.